Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93057
Export to Endnote
Title: MLN 1123 Annual Technical Report 5 January 2016 to 4 January 2017
Title Holder / Company: Mount Isa Mines
McArthur River Mining
Report id: CR2017-0010
Tenure: MLN1123
Year: 2017
Author: Morris, E
Abstract: During the reporting period, two exploratory programs were completed. This included a geophysical survey using Electrical Resistivity Imaging (ERI) as well as a drilling program. The aims of the ERI survey were to: Define key geological structures influencing groundwater pathways and; Identify drill targets to define these structures further. The drilling program aimed at: Identifying targets of potential high groundwater transport as defined by the ERI Survey; Waste Characterisation and; Instrument installation. The ERI survey identified two targets for drilling which were drilled during the 2016 reporting period. These drill holes identified faulted structures throughout MLN 1123. A total of 100 samples (including QAQC) from the waste characterisation drilling were submitted to ALS Brisbane with 74% of returned samples considered environmentally benign.
NOTESee CR2017-0009 for ERI Survey Data
Date Added: 21-Oct-2024
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
Geology_Logs.txt11.44 kBText Add
MLN1123_2017_A.pdf974.74 kBPDF Add
MLN1123_2017_A_01_DrillCollars.txt3.27 kBText Add
MLN1123_2017_A_02_DownholeSurvey.txt2.49 kBText Add
MLN1123_2017_A_03_Lithologs.txt103.38 kBText Add
MLN1123_2017_A_04_DownholeGeochem.txt15.05 kBText Add
MLN1123_2017_A_05_QAQCGeochem.txt3.8 kBText Add
MLN1123_2017_A_06_Filelisting.txt1.33 kBText Add
MRM_SPS_EIS_Drilling_2016_Start_End_Dates_CHY_20170216.xlsx8.69 kBMicrosoft Excel XML Add
CR2017-0010_Sections.zip5.3 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader