Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93056
Export to Endnote
Title: | MLN 1122 Annual Technical Report 5 January 2016 to 4 January 2017 |
Title Holder / Company: | Mount Isa Mines McArthur River Mining |
Report id: | CR2017-0009 |
Tenure: | MLN1122 |
Year: | 2017 |
Author: | Morris, E |
Abstract: | During the reporting period, two exploratory programs were completed. This included a geophysical survey using Electrical Resistivity Imaging (ERI) as well as a drilling program. The aims of the ERI survey were to: Define key geological structures influencing groundwater pathways and; Identify drill targets to define these structures further. The drilling program aimed at: Identifying targets of potential high groundwater transport as defined by the ERI Survey and; Instrument installation. The ERI survey identified two targets for drilling which were drilled during the 2016 reporting period. These drill holes identified faulted structures throughout MLN 1122. |
Date Added: | 21-Oct-2024 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
Geology_Logs.txt | 11.44 kB | Text | Add |
MLN1122_2017_A.pdf | 903.43 kB | Add | |
MLN1122_2017_A_01_DrillCollars.txt | 2.53 kB | Text | Add |
MLN1122_2017_A_02_DownholeSurvey.txt | 2.24 kB | Text | Add |
MLN1122_2017_A_03_Lithologs.txt | 36.42 kB | Text | Add |
MLN122_2017_A_04_Filelisting.txt | 1.16 kB | Text | Add |
MRM_SPS_EIS_Drilling_2016_Start_End_Dates_CHY_20170216.xlsx | 8.45 kB | Microsoft Excel XML | Add |
CR2017-0009_Geophysics.zip | 118.24 MB | ZIP | Add |
CR2017-0009_Sections.zip | 2.05 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.