Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93035
Export to Endnote
Title: | Processing Report Borroloola NT PTEM / AEM-PTP Survey |
Title Holder / Company: | McArthur NT Armour Energy |
Report id: | PR2023-G008 |
Tenure: | EP171; EP174; EP176; EP190; EP191; EP192 |
Year: | 2022 |
Corporate Author: | Pinemont Technologies Australia |
Abstract: | Pinemont Technologies Australia conducted an Audio Electro Magnetic Passive Transient Impulse (PTEM/AEM-PTP) survey for Armour Energy over an area of approximately 20,000 Sq.Km in the NT, with the base of operations in the town of Borroloola, NT. The raw data acquired was sent to Pinemont Technologies Australia's processing center in Perth for QC, processing and refinement between July 2nd and September 29th, 2021. This report documents the processing phase of the Borroloola-NT PTEM/AEM-PTP survey. Processing improved the signal to noise ratio (SNR) of the acquired data, removing noise and enhancing transient density anomalies. The transient density Track data and gridded attribute maps were generated during processing. This data will allow the interpreter to spatially identify areas of higher transient densities within the survey. The outputs from processing were provided in a range of formats including shapefiles, ascii files, raster image files (GeoTiffs) and kmz files for importation into the clients preferred geophysical interpretation or GIS software package. |
NOTE: | For raw and processed data, please see PR2023-G009 record |
Date Added: | 30-Jul-2024 |
Appears in Collections: | Petroleum Geophysical Surveys (PEX Geophysics) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR2023-G008_Processing_Report-Borroloola_AEM-PTP_Survey.pdf | 22.92 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.