Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92990
Export to Endnote
Title: First Annual Report for the period 30 April 2021 to 29 April 2022 Tenement(s) No(s) EL 32233, 32234 and 32246 - Tennant 4, 5 and 7 Tennant Project (Group Report Number GR574)
Title Holder / Company: Rio Tinto Exploration
Report id: CR2022-0179
Tenure: EL32233;  EL32234;  EL32246
Year: 2022
Author: Huxley, L
Abstract: Exploration Licences (EL) 32233, 32234 and 32246 were acquired by Rio Tinto Exploration Limited (RTX) in 2021. These ELs were granted on the 20th of April 2021 and were amalgamated into a grouped annual reporting project, the group reporting number being GR574. No fieldwork has been conducted within this reporting period. RTX has engaged with the Central Land Council in order to develop an agreement with the traditional owners to allow RTX to conduct exploration activities. During this reporting period RTX has begun organising and planning the drill testing operations. This operation looks to utilise a small aircore drill crew to drill test the highest priority targets produced from the pre-grant SkyTEM survey.
NOTESee CR2021-0387 for SkyTEM survey
Date Added: 3-Jul-2024
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR574_2022_GA.pdf2.75 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader