Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92618
Export to Endnote
Title: Magnetotelluric Investigation Along Seismic Transect 19GA-B1 Results from Round 15 of the Geophysics and Drilling Collaborations Programme EL 32734, EL 32544, EL 32550, EL 32551, EL 32546, EL 32922, EL 32733
Title Holder / Company: Teck Australia
Report id: CR2023-0010
Tenure: EL32544;  EL32546;  EL32550;  EL32551;  EL32733;  EL32734;  EL32922
Year: 2023
Author: Hennessy, L
Poole, G
Abstract: Zonge Engineering & Research Organization (Australia) conducted a Magnetotelluric (MT) survey at the Barkly project in the Northern Territory for Teck Australia Pty Ltd. A total of 155 MT soundings were carried out, including 116 overnight Broad Band Magnetotelluric (BBMT) sites, 37 shorter duration Audio-frequency Magnetotelluric soundings (AMT), and 2 remote BBMT soundings. The objectives of this work are to better understand the nature of covered Paleoproterozoic stratigraphy by correlating MT inversion results with seismic images from 19GA-B1. The results of this work can be used to interpret major stratigraphic unit, structural features, and estimate the thickness of Cambrian cover in the Barkly Region.
NOTEAdditional geophysics datasets are available on request
Date Added: 10-Jun-2023
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
Teck_Barkly_MT_Survey_GDC1500028_Final_Report.pdf1.24 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader