Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92606Export to Endnote
| Title: | Annual Report ML 29678 period 27 September 2015 to 26 September 2016 |
| Title Holder / Company: | Resolution Investments (NT) |
| Report id: | CR2016-0544 |
| Tenure: | ML29678 |
| Year: | 2016 |
| Author: | Jettner, WA |
| Abstract: | Activities undertaken in the 2015/16 reporting year consisted of laboratory testwork to establish the cyanide recovery at P80 passing 75 micrometre. This was done in NAL in Pine Creek where a hot cyanide leach was undertaken. This was essentially an agitated cyanide leach at elevated temperatures in the presence of a strong oxidiser. This essentially compressed the time scale and gave comparable recoveries to a standard CIP process. Results from this test work indicated a 100% recovery was possible with the use of cyanide at a standard ball mill grind. Field work consisted of the mining of the remaining bulk sample and the backfilling of the pit. A total of 1100t of ore was mined from the 2016 pit in August 2016. |
| Date Added: | 21-May-2023 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| ML29678_2016_A.pdf | 4.82 MB | Add | |
| CR2016-0544_ML29678_2016_DataFiles.zip | 1.62 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.