Title: Annual report Year 19 MLN 1154 Merlin Diamond Project Annual report for the period 1 January 2016 to 31 December 2016
Title Holder / Company: Merlin Operations
Merlin Diamonds
Report id: CR2016-0749
Tenure: MLN1154
Year: 2017
Author: Rockett, GMI
Abstract: No on-ground exploration occurred during 2016. Planning for the proposed 2017 RC drill program commenced, with fourteen targets prioritised from the 2014 Geophysical Review. A further fifteen targets have been identified as requiring additional on-ground work, such as detailed ground EM, to resolve the target. The company continued to review rehabilitation progress using a photographic survey undertaken after the wet season, and at the end of the following dry season. The 2016 surveys were undertaken in April and November. Water quality and water level testing in mine voids and strategic water bores around the lease continued using a TPS 90 FLT water quality meter and a Herron Dipper T water level meter. During 2016, the company achieved a number of steps towards re-establishing full production at the Merlin Diamond Mine. The Mining Management Plan was approved in September 2016 initiating the first on-ground work.
Date Added: 23-Dec-2022
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
MLN1154_2017_A_AppendixI.pdf77.25 kBPDF Add
MLN1154_2017_A_MDL_LithCodes.pdf173.6 kBPDF Add
MLN1154_2017_A.pdf5.15 MBPDF Add
MLN1154_2017_A_FileListing.pdf75.8 kBPDF Add
MLN1154_2017_A_FileListing.txt1.37 kBText Add
MLN1154_2017_A_Map1_A4.pdf92.31 kBPDF Add
MLN1154_2017_A_Map2_A4.pdf1.43 MBPDF Add
MLN1154_2017_A_Map3_A4.pdf181.55 kBPDF Add
MLN1154_2017_A_Map4_A4.pdf731.06 kBPDF Add
MLN1154_2017_A_Map5_A4.pdf1.3 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader