Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92452
Export to Endnote
Title: | EL 28620 - Barkly, Tennant Creek Northern Territory Annual Report reporting period 16 December 2015 to 15 December 2016 |
Title Holder / Company: | Colour Minerals Meteoric Resources Blaze International |
Report id: | CR2016-0607 |
Tenure: | EL28620 |
Year: | 2016 |
Author: | Prentice, I |
Abstract: | This report details exploration carried out in the 2016 reporting year at the Barkly project, EL 28620, which was granted on 16 December 2011 and extended for a further two year term on 16 December 2015. The Barkly project is located in the Tennant Creek area of the Northern Territory as shown in Figures 1 and 2. Figure 1 shows the regional setting and Figure 2 shows the tenement details. The target commodities are copper and gold. A change of control of Blaze International Limited, the parent Company of the majority tenement owner Colour Minerals Pty Ltd, occurred during the reporting period. As a result of this change in control of the parent entity there was also a transition to a new corporate and technical management team. During the reporting period the new corporate and technical management team completed desk top reviews of all past exploration activity to enable a full assessment of the technical merits of the project and to produce a plan for ongoing exploration of the project. This work has resulted in the design of a drilling program to further evaluate the quantum and grade of the Bluebird mineralisation, with particular focus on the importance of the modelling of the late stage Harpic Fault. |
Date Added: | 23-Dec-2022 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL28620_2016_A_01_Report.pdf | 1.53 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.