Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92378
Export to Endnote
Title: | Second Annual Technical Report ML 29584 8 July 2015 to 7 July 2016 |
Title Holder / Company: | Sherwin Iron |
Report id: | CR2016-0420 |
Tenure: | ML29584 |
Year: | 2016 |
Author: | Ryall, T |
Abstract: | During the current reporting period from 8th July 2015 to 7th July 2016, with Sherwin Iron continuing in Receivership, an intending purchaser Al Rawda Resources Australia Pty Ltd (Al Rawda) undertook limited technical activity as part of its due diligence on Sherwin's assets and future valuation. This programme included metallurgical testwork on two large samples of medium grade iron oxide from bulk sample pit stockpiles. The testwork at Nagrom Laboratories in Perth was undertaken to determine the optimum beneficiation process path for future iron ore production. It should be noted that in this reporting period there has been no mineral production on this ML. |
Date Added: | 21-Oct-2022 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
ML29584_2016_A_01.pdf | 1.68 MB | Add | |
ML29584_2016_A_02_Preliminary_Characterisation_Testwork_T2192.xlsx | 6.06 MB | Microsoft Excel XML | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.