Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92378
Export to Endnote
Title: Second Annual Technical Report ML 29584 8 July 2015 to 7 July 2016
Title Holder / Company: Sherwin Iron
Report id: CR2016-0420
Tenure: ML29584
Year: 2016
Author: Ryall, T
Abstract: During the current reporting period from 8th July 2015 to 7th July 2016, with Sherwin Iron continuing in Receivership, an intending purchaser Al Rawda Resources Australia Pty Ltd (Al Rawda) undertook limited technical activity as part of its due diligence on Sherwin's assets and future valuation. This programme included metallurgical testwork on two large samples of medium grade iron oxide from bulk sample pit stockpiles. The testwork at Nagrom Laboratories in Perth was undertaken to determine the optimum beneficiation process path for future iron ore production. It should be noted that in this reporting period there has been no mineral production on this ML.
Date Added: 21-Oct-2022
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ML29584_2016_A_01.pdf1.68 MBPDF Add
ML29584_2016_A_02_Preliminary_Characterisation_Testwork_T2192.xlsx6.06 MBMicrosoft Excel XML Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader