Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92194
Export to Endnote
Title: | Group Technical Report GR159 MLN 2-3, MLN 951-953 and MLN 956-961 for the period 1 July 2015 to 30 June 2016 |
Title Holder / Company: | Groote Eylandt Mining Company South32 |
Report id: | CR2016-0421 |
Tenure: | MLN2; MLN3; MLN951; MLN952; MLN953; MLN956; MLN957; MLN958; MLN959; MLN960; MLN961 |
Year: | 2016 |
Author: | Harvey, J |
Abstract: | Various drilling programs were successfully carried out this year for a range of outcomes, including updating the resource model, density and yield assumptions. RC drilling will increase the confidence of GEMCO's resource model in order to optimize the long term mine plan. Sufficient data is available from the diamond core drilling programs to apply to the next 5 years of the mine life. Core drilling has therefore been replaced by a more extensive RC infill drilling campaign for the upcoming period. Results of these drilling programs are currently being incorporated into updated models and will be reported during the next cycle. FY17 will focus on additional RC infill drilling in areas of increased complexity. Emphasis will be on the areas outlined in the current 5 year mine plan footprint. In addition, regional drilling is planned for the north and western parts of the mining leases in order to improve confidence and add additional resource in areas of sparse drill coverage. Aerial photography fly-overs will be conducted as required throughout the year in order to calibrate production volumes and for planning purposes. |
Date Added: | 2-Aug-2022 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR159_2016_GA.pdf | 1.38 MB | Add | |
CR2016-0421_AppendixA_Data.zip | 1.32 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.