Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92106
Export to Endnote
Title: Exploration Licences Mount Todd Project Northern Territory Australia Combined Annual Report for the period ended 14 March 2016
Title Holder / Company: Vista Gold Australia
Report id: CR2016-0243
Tenure: EL29882;  EL29886
Year: 2016
Author: Harris, P
Abstract: This annual report documents the work completed on the licences for the period from 15 March 2015 to 14 March 2016. The EL's as they stand are the result of a consolidation and spilt of EL 25576, EL 25670, EL 25668 and EL 25669 which occurred on the 16 September 2013. Vista Gold Australia Pty Ltd. is the sole operator and manager of the exploration work. Work on the exploration licenses entailed drilling at Wandie and Snowdrop. Despite continued budgetary limitations, 3 diamond holes were completed at Wandie intersecting significant Cu mineralisation with coincident minor Au. 3 diamond holes were also drilled at the Snowdrop prospect with all holes intersecting low-grade Au anomalism.
Date Added: 26-Apr-2022
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR087_2016_GA_01.pdf1.22 MBPDF Add
GR087_2016_GA_02_Wandie_review_22016_GEOSBORNE_PL.PDF229.83 kBPDF Add
CR2016-0243_Data.zip270.72 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader