Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/92006
Export to Endnote
Title: Annual Report Mount Howship Project 15 May 2015 to 14 May 2016
Title Holder / Company: Heavy Metal Resources
Report id: CR2016-0357
Tenure: EL9637
Year: 2016
Author: Stewart, D
Abstract: The field programme for 2015-2016 was suspended and desktop studies were carried out by Andrew Browne of GeoSynthesis Pty Ltd. It has become apparent, by default, that Cameco's model of searching for uranium deposits by Interpretation of the sandstone overlay is not productive in Arnhem Land. The diamond drilling of fault zones in the sandstone has had negative results. It is HMR's intention to test the margins of the Kombolgie and the lower sediments by geological methods over the next dry season.
Date Added: 20-Mar-2022
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL9637_2016_A_01.pdf897.33 kBPDF Add
EL9637_2016_A_02_GeoSynthesis_Report_160401_HMR_EL9637.pdf8.87 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader