Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91806
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRockett, GMIen_US
dc.date.accessioned2021-09-21T22:33:27Z-
dc.date.issued2015en_US
dc.identifier.govdocCR2015-0946en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91806-
dc.description.abstractExploration activities during the reporting period were less extensive than 2014, with minimal on-ground work undertaken. The company-owned diamond exploration laboratory at Wangara in Perth, WA, closed down in mid 2015. This facility serviced all exploration projects held by Merlin Diamonds across the NT as well as WA. As storage facilities at the Laboratory were very full, a review of samples held there was undertaken during 2014, and again in 2015 prior to its closure in June. Samples, such as sample concentrates, sample duplicates and other non-critical material, were de-catalogued and the material discarded. No drill core was discarded, although some RC drill chips were relinquished as they were not considered of any further value. The company continued to review progress of rehabilitation in exploration areas by way of an annual photographic survey. The 2015 survey was undertaken in April and the photographs included in the exploration MMP for the lease. Water testing in the flooded mine pits and at strategic places around the mining lease has been on-going - results are included in the annual environmental report. A review of all exploration undertaken on MLN 1154 was undertaken in order to identify drill-ready high confidence targets. Six targets were identified, and one potential target. During the reporting period, Merlin Diamonds Limited has focused on furthering development of the mechanical clamshell grab mining technique. Key developments include the finalisation of the Feasibility Study, and the preliminary design of the barge arrangement upon which the clamshell grab will operate. Capital-raising to fund the project has also been a key aspect of 2015 activities.en_US
dc.subject.classificationDiamondsen_US
dc.subject.classificationKimberlite pipesen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationRegional geologyen_US
dc.subject.classificationPrevious explorationen_US
dc.subject.classificationReviewsen_US
dc.subject.classificationRehabilitationen_US
dc.subject.classificationMine developmenten_US
dc.subject.classificationFeasibility studiesen_US
dc.titleAnnual Report Year 18 MLN 1154 Merlin Diamond Project for the period 1 January 2015 to 31 December 2015en_US
dc.relation.isatmap100Glyde 6164en_US
dc.relation.isatmap250Bauhinia Downs SE5303en_US
dc.relation.isatgeolprovinceGeorgina Basinen_US
dc.relation.isatgeolprovinceMcArthur Basinen_US
dc.description.stratnameRoper Groupen_US
dc.description.stratnameTawallah Groupen_US
dc.description.stratnameBukalara Sandstoneen_US
dc.description.mineprospectnameMerlinen_US
dc.identifier.tenureMLN1154en_US
dc.description.modifyhistory19/07/2021en_US
dc.description.modifyhistory09/09/2021en_US
dc.description.modifyhistory22/09/2021en_US
dc.contributor.holderMerlin Operationsen_US
dc.contributor.holderMerlin Diamondsen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)
dc.identifier.govdocprefixCR2015
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
MDL_LithCodes.pdf173.6 kBPDF Add
MLN1154_2016_A.pdf4.36 MBPDF Add
MLN1154_2016_A_FileListing.pdf75.64 kBPDF Add
MLN1154_2016_A_FileListing.txt1.36 kBText Add
CR2015-0946_MLN1154_2016_A_Map_1_A4.pdf75.97 kBPDF Add
CR2015-0946_MLN1154_2016_A_Map_2_A4.pdf1.42 MBPDF Add
CR2015-0946_MLN1154_2016_A_Map_3_A4.pdf180.61 kBPDF Add
CR2015-0946_MLN1154_2016_A_Map_4_A4.pdf730.8 kBPDF Add
CR2015-0946_MLN1154_2016_A_Map_5_A4.pdf1.29 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader