Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91805
Export to Endnote
Title: | Seismic Data Reprocessing Final Report |
Title Holder / Company: | Central Petroleum |
Report id: | PR2019-G001 |
Tenure: | EP115 |
Year: | 2018 |
Corporate Author: | Howman Seismic Services |
Abstract: | The Highway, Alice and Glen Edith Lines were recorded between 1980 and 1982 by GSI crew 1858. Original processing was performed by Seismic Data Processors International. Reprocessing of 1981 Glen Edith 2D SS was completed by Howman Seismic Service in 2018 with the objectives to obtain clearer and more easily interpretable sections. |
Document Type: | Seismic Processing |
Date Added: | 19-Sep-2021 |
Appears in Collections: | Petroleum Geophysical Surveys (PEX Geophysics) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR2019-G001_Glen_Edith_2D_SS_1981_Reprocessing_Report.pdf | 9.61 MB | Add | |
PR2019-G001_Deliverables_Data.zip | 1.17 GB | ZIP | Add |
PR2019-G001_Deliverables_Reports.zip | 22.05 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.