Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91805
Export to Endnote
Title: Seismic Data Reprocessing Final Report
Title Holder / Company: Central Petroleum
Report id: PR2019-G001
Tenure: EP115
Year: 2018
Corporate Author: Howman Seismic Services
Abstract: The Highway, Alice and Glen Edith Lines were recorded between 1980 and 1982 by GSI crew 1858. Original processing was performed by Seismic Data Processors International. Reprocessing of 1981 Glen Edith 2D SS was completed by Howman Seismic Service in 2018 with the objectives to obtain clearer and more easily interpretable sections.
Document Type: Seismic Processing
Date Added: 19-Sep-2021
Appears in Collections:Petroleum Geophysical Surveys (PEX Geophysics)

Files in this Report:
File SizeFormat Add to
Download
PR2019-G001_Glen_Edith_2D_SS_1981_Reprocessing_Report.pdf9.61 MBPDF Add
PR2019-G001_Deliverables_Data.zip1.17 GBZIP Add
PR2019-G001_Deliverables_Reports.zip22.05 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader