Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91789
Export to Endnote
Title: | EL 28620 Annual Report for reporting period 16 December 2014 to 15 December 2015 |
Title Holder / Company: | Meteoric Resources Blaze International |
Report id: | CR2015-0959 |
Tenure: | EL28620 |
Year: | 2015 |
Author: | Prentice, I |
Abstract: | Exploration completed for the reporting period consisted of down hole EM (DHTEM) surveying of hole BBDD0004, detailed petrology on the mineralised interval in drill hole BBDD0002, updated geological modelling / interpretation of the Bluebird copper-gold prospect, a drill hole rehabilitation program and design and planning of the Bluebird Phase III drilling program. |
Date Added: | 10-Sep-2021 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL28620_2015_A_01_Report.pdf | 1.6 MB | Add | |
EL28620_2015_A_02_Appendix1.pdf | 128.36 kB | Add | |
EL28620_2015_A_03_Appendix2.pdf | 5.19 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.