Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91668Export to Endnote
| Title: | MLN 380 Annual Report 12 October 2014 to 11 October 2015 |
| Title Holder / Company: | Heydon, T |
| Report id: | CR2015-0804 |
| Tenure: | MLN380 |
| Year: | 2015 |
| Author: | Heydon, T |
| Abstract: | Work undertaken during the reporting period included; a clean up of the total area of rusted metals, re-surveying and pegging of the boundary, metal detecting, panning, and construction of a small gold washing machine to be used during March-April excavations. Due to the lack of significant findings by detecting we will be excavating and small area the other side of the waterway from the dwelling. |
| Date Added: | 21-Jul-2021 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| MLN380_2015_A.pdf | 2.56 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.