Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91625
Export to Endnote
Title: Harts Range Spinifex Bore Garnet Project Annual technical group report for the period 16 October 2014 to 15 October 2015
Title Holder / Company: Australian Abrasive Minerals
Report id: CR2015-0731
Tenure: EL24360;  EL24378;  EL28696
Year: 2015
Author: Baxter, J
Barnett, J
Abstract: A garnet resource has been identified and estimated to contain 23.1Mt of sand containing 1.2Mt of garnet in the measured category and 44.5Mt of sand containing 2.65Mt garnet in the Inferred category. The tenements also contain a bore field which can supply process water at a rate of 1,210 m3 per day (14L per second). These are the keystones for project development. In March-April 2015 clearance for six holes was obtained. Of these five were drilled in sites chosen on the basis of the depth to basin and expected aquifer thickness. There is little correlation between aquifer thickness and depth to bedrock.
Date Added: 7-Jun-2021
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR078_2015_A_01.pdf4.08 MBPDF Add
GR078_2015_A_02_geology.txt3.63 kBText Add
GR078_2015_A_03_lithcode.txt968 BText Add
GR078_2015_A_04_collars.txt2.28 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader