Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91624
Export to Endnote
Title: | Combined Annual Exploration Report Warumpi Project EL 6861, EL 6732, EL 10379 and EL 30306 year ending 10 September 2015 |
Title Holder / Company: | Castile Resources Lassact |
Report id: | CR2015-0738 |
Tenure: | EL6861; EL6732; EL10379; EL30306 |
Year: | 2015 |
Author: | Burke, R |
Abstract: | During the reporting period Castile conducted multiple geophysics programs through EL 10379 focusing predominately on the Huron base metal prospect. Multiple heritage clearances over the region were conducted to enable geophysics crews to conduct on ground surveys and to advance the project to drill ready stage. These surveys have not only highlighted the structural complexity of the region and potential prospective lithology for follow-up work, but also multiple drill ready targets. With the approval of the Exploration Mine Management Plan, the Huron Prospect is ready to drill. However, issues highlighted by recent heritage clearances and on-going negotiations with Central Land Council and Traditional Owners have delayed the process. |
Date Added: | 7-Jun-2021 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR317_2015_GA.pdf | 1.62 MB | Add | |
CR2015-0738_Geophysics.zip | 62.28 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.