Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91562
Export to Endnote
Title: Partial Relinquishment Report EL 29731, 16 May 2013 to 5 May 2017
Title Holder / Company: May Drilling
Report id: CR2017-0337
Tenure: EL29731
Year: 2017
Author: Edgar, H
Abstract: EL 29731 is within May Drilling's Daly River Project, which comprises of Exploration Licences 28462, 29731 and 30521. EL 29731 is located approximately 115 km South of Darwin. EL 29731 originally comprised of 16 blocks. On 5 May 2017, May Drilling reduced the licence from 16 blocks to 10 blocks. May Drilling conducted numerous activities on the relinquished blocks since grant. Desktop studies were completed, which included a geophysical data review and helicopter reconnaissance was also conducted. It was determined that the lithology in this area of the six relinquished blocks is too young to host economic mineral deposits
Date Added: 26-May-2021
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL29731_2017_P_01.pdf981.86 kBPDF Add
EL29731_2017_P_02_Appendix1.pdf905.44 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader