Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91466
Export to Endnote
Title: | Annual Report for MLS 150 and MLS 151 White Range Gold Mine period ended 20 March 2015 |
Title Holder / Company: | Red Dingo Corp Intermin Resources North Concrete NT |
Report id: | CR2015-0493 |
Tenure: | MLS150; MLS151 |
Year: | 2015 |
Abstract: | During the previous twelve months the site has been on care and maintenance. We have established some temporary accommodation to enable this. All of the Athol Pine Trees that had sprung up in the tailings dam were removed. As a result of the above average rain early in 2015, considerable damage was caused to the access road, this damage was repaired and the road was graded to maintain acceptable access to the site. |
Date Added: | 30-Apr-2021 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
MLS150_MLS151_2015_GA.pdf | 209.04 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.