Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91295
Export to Endnote
Title: Walabana Project Group Annual Report GR145/10 EL 26848 and EL 27115, 5 March 2014 to 4 March 2015
Title Holder / Company: Toro Energy
Enigma Mining
TNG
Report id: CR2015-0196
Tenure: EL26848;  EL27115
Year: 2015
Author: Wetherley, C
Abstract: The Walabanba Hills Project is operated by Enigma Mining Ltd, a wholly owned subsidiary of TNG Ltd. The project comprises two exploration licences (EL 26848 and EL 27115) in the north-central portion of the Palaeoproterozoic Arunta Province. Enigma signed a Heads of Agreement (HOA) with the Australian uranium exploration and project development company, Toro Energy Limited in April 2012. The agreement gives TNG the right to explore for all minerals except uranium within the licence area. Enigma took out the JV agreement with a view to exploration for primary base metal sulphides, nickel and magnetite hosted vanadium-titanium, as found in the Mount Peake Fe-V-Ti deposit to the east. Target areas were identified from the HELITEM survey in 2012 and many were recommended for geochemical surveys, ground EM and potentially drilling follow-up. Fixed loop EM surveys were carried out on four targets in April 2014. All anomalies were confirmed and drilling recommended to test the anomalous areas.
Date Added: 8-Mar-2021
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR145_2015_GA_01.pdf2.83 MBPDF Add
GR145_2015_GA_03_VerificationList.txt1.03 kBText Add
CR2015-0196_Geophysics.zip2.9 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader