Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91193
Export to Endnote
Title: MLN 1121 Annual Report 5 January 2014 to 4 January 2015 McArthur River Mine
Title Holder / Company: Mount Isa Mines
McArthur River Mining
Report id: CR2015-0028
Tenure: MLN1121
Year: 2015
Author: Blackburn, A
Abstract: A Waste Characterisation Drilling Program was undertaken on MLN 1121 during the reporting period, as part of ongoing EIS and Life of Mine studies. Eleven HQ diamond holes with mud-rotary pre-collars were drilled for a total of 2093.1 metres. In total, 635 waste characterisation samples were collected with analytical results still pending at the end of the reporting period. The availability of fresh drill core also enabled the collection of 50 sulphide-bearing hanging wall samples for Ammonium Nitrate Reactivity and Sleep Time testing.
NOTESee CR2016-0028 for 2014/2015 Drill Assays
Date Added: 2-Feb-2021
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
MLN1121_2015_A_01.pdf974.88 kBPDF Add
MLN1121_2015_A_02_NTSL4_COLL2015A.txt3.11 kBText Add
MLN1121_2015_A_03_NTDS4_SURV2015A.txt4.22 kBText Add
MLN1121_2015_A_04_NTDL4_GEO2015A.txt113.37 kBText Add
MLN1121_2015_A_05_NTDL4_GEOT2015A.txt91.89 kBText Add
MLN1121_2015_A_06_LOGGING_CODES.xlsx35.68 kBMicrosoft Excel XML Add
MLN1121_2015_A_07_Verification_List_2015.txt1.13 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader