Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91193
Export to Endnote
Title: | MLN 1121 Annual Report 5 January 2014 to 4 January 2015 McArthur River Mine |
Title Holder / Company: | Mount Isa Mines McArthur River Mining |
Report id: | CR2015-0028 |
Tenure: | MLN1121 |
Year: | 2015 |
Author: | Blackburn, A |
Abstract: | A Waste Characterisation Drilling Program was undertaken on MLN 1121 during the reporting period, as part of ongoing EIS and Life of Mine studies. Eleven HQ diamond holes with mud-rotary pre-collars were drilled for a total of 2093.1 metres. In total, 635 waste characterisation samples were collected with analytical results still pending at the end of the reporting period. The availability of fresh drill core also enabled the collection of 50 sulphide-bearing hanging wall samples for Ammonium Nitrate Reactivity and Sleep Time testing. |
NOTE: | See CR2016-0028 for 2014/2015 Drill Assays |
Date Added: | 2-Feb-2021 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
MLN1121_2015_A_01.pdf | 974.88 kB | Add | |
MLN1121_2015_A_02_NTSL4_COLL2015A.txt | 3.11 kB | Text | Add |
MLN1121_2015_A_03_NTDS4_SURV2015A.txt | 4.22 kB | Text | Add |
MLN1121_2015_A_04_NTDL4_GEO2015A.txt | 113.37 kB | Text | Add |
MLN1121_2015_A_05_NTDL4_GEOT2015A.txt | 91.89 kB | Text | Add |
MLN1121_2015_A_06_LOGGING_CODES.xlsx | 35.68 kB | Microsoft Excel XML | Add |
MLN1121_2015_A_07_Verification_List_2015.txt | 1.13 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.