Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/91062
Export to Endnote
Title: Group Annual Technical Report for EL 27972 Charlotte and EL 27974 Central Railroad for period ending 20 September 2014
Title Holder / Company: Tellus Holdings
Report id: CR2014-0857
Tenure: EL27972;  EL27974
Year: 2014
Author: Livesey, J
Abstract: During the reporting period Tellus completed a diamond drilling program on nearby tenement EL 29018. Core sampling collection and wireline logging were completed. Geochemical and mineralogical analysis results were positive confirming massive halite unit. The results from this drilling program were used to reinterpret seismic over the project area and assist in mine planning studies.
Date Added: 21-Dec-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR225_2014_GA_01.pdf6.9 MBPDF Add
GR225_2014_GA_02_CrossSection_S-N.pdf283.38 kBPDF Add
GR225_2014_GA_03_CM08-06_TVD.pdf3.08 MBPDF Add
GR225_2014_GA_04_CM08-12_TVD.pdf2.14 MBPDF Add
GR225_2014_GA_05_Chandler_Seismic_Screen_Captures.pdf6.08 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader