Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90749
Export to Endnote
Title: GR224 Tin Camp Creek Project Annual Report 30 May 2013 to 29 May 2014
Title Holder / Company: TCC Project
West Arnhem Corporation
Alligator Energy
Report id: CR2014-0447
Tenure: EL24921;  EL24922;  EL25002
Year: 2013
Author: Moorhouse, P
Abstract: Work undertaken during the 2013-2014 tenure year included 31 drill holes for 5,584 metres comprising of 3924 metres of reverse circulation drilling and 1660 metres of diamond drilling, from which 977 drill samples were sent for analysis. In addition to this, 3 downhole water samples were submitted for radionuclide analysis at ANSTO. As part of Alligators data review, 8369 metres of historic core was re-logged to ensure consistency between drilling phases. Tenement wide reconnaissance included 16 rock chip samples being submitted for multi element geochemistry and 7 ground water samples for radionuclide analysis. 5064 ground radiometric stations were completed. The outcome of the field activities produced a greater understanding of the geology, and the structural controls of mineralisation.
Date Added: 2-Oct-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR224_2014_GA_01.pdf2.49 MBPDF Add
GR224_2014_GA_02_RockChips.pdf315.11 kBPDF Add
GR224_2014_GA_03_APPENDIX1.pdf31.09 kBPDF Add
CR2014-0447_DATA.zip199.6 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader