Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90731
Export to Endnote
Title: Annual Technical Report EL 29018 Chandler for period ending 11 April 2014
Title Holder / Company: Tellus Holdings
Report id: CR2014-0374
Tenure: EL29018
Year: 2014
Author: Livesey, J
Abstract: During the reporting period Tellus completed a drilling program within EL 29018 to confirm depth and thickness of Chandler Salt Formation. Two diamond drillholes were completed with a total of 1937m drilled. Excellent core recovery was achieved throughout the holes. Downhole wireline survey was completed on CH001A Geochemical and XRD analysis results confirm high grade halite deposit.
Date Added: 30-Sep-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL29018_2014_A_01.pdf135.86 MBPDF Add
EL29018_2014_A_02_DrillCollars.txt2.31 kBText Add
EL29018_2014_A_03_DownholeGeochem.txt47.13 kBText Add
EL29018_2014_A_04_QAQCGeochem.txt33.71 kBText Add
EL29018_2014_A_05_LithoLogs.txt30.22 kBText Add
EL29018_2014_A_06_FileListing.txt631 BText Add
EL29018_2014_A_07_CH001A_ATV.las2.87 MBUnknown Add
EL29018_2014_A_08_CH001A_FWS_FINAL.las938.8 kBUnknown Add
EL29018_2014_A_09_CH001A_MIG_FINAL.las3.81 MBUnknown Add
EL29018_2014_A_10_CH001A_MST_FINAL.las10.46 MBUnknown Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader