Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90538
Export to Endnote
Title: McArthur Project Partial Surrender Report EL 31703, 8 May 2018 to 7 May 2020
Title Holder / Company: Todd River Metals
Report id: CR2020-0187
Tenure: EL31703
Year: 2020
Author: Wetherley, C
Abstract: The McArthur River Project is operated by Todd River Metals Pty Ltd, a wholly owned subsidiary of Todd River Resources Limited. The project comprises four exploration licences, EL 27711, EL 30085, EL 31703 and EL 31704, which lie in the McArthur Basin and in the southwestern portion of the Batten Fault Zone. Group reporting was approved in May 2015 (GR367) with a reporting period of 9 July to 8 July. EL 31703 and EL 31704 were added to this group reporting in January 2019. A partial surrender of EL 31703 from 40 blocks to 18 blocks was undertaken at the second anniversary of the licence. No exploration has been undertaken on the surrendered blocks.
Date Added: 28-Jul-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL31703_2020_P.pdf1.06 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader