Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90463
Export to Endnote
Title: Annual Technical Report period 1 January 2013 to 31 December 2013 Juno Project
Title Holder / Company: Tennant Gold
Excalibur Mining Corporation
Report id: CR2013-1137
Tenure: MLC45;  MLC46;  MLC47;  MLC68;  MLC154;  MLC155;  MCC284;  MLC578;  MLC579
Year: 2014
Author: Hanson, J
Abstract: During the reporting period Excalibur commissioned Atlas Geophysics to carry out a ground based gravity survey across all the Juno Tenements. This survey was carried out over a grid spacing of 50m x 100m and designed for structural evaluation to further exploration across its Juno tenements in the Tennant Creek region. The area consists of a mined historic shaft and several unmined prospects. In May 2013 a full site environmental audit was completed by the department of Mines and Energy across the tenement area. Only minor rehabilitation works remain to be completed. During December 2012 a completely new structural analysis was initiated this work is ongoing as time and funding allows. A ground based gravity geophysics survey was carried out in November 2013 this survey was initiated to show structural geological features in areas where surface geology has been destroyed by rehabilitation. When the results of this data are analysed drill programs based on surface mapping and gravity structure will be proposed.
NOTESee CR2014-1125 for Gravity Survey Data
Date Added: 17-Jun-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR017_2013_GA.pdf1.09 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader