Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90367
Export to Endnote
Title: | EL 28175 Harry Creek, EL 28271 Bald Hill, EL 28340 Bushy Park, Yambah Project Year 3 Annual Report for the period 1 October 2012 to 30 September 2013 |
Title Holder / Company: | Mithril Resources |
Report id: | CR2013-0921 |
Tenure: | EL28175; EL28271; EL28340 |
Year: | 2013 |
Author: | Mizow, D |
Abstract: | Work completed during the reporting period included: 13 RC holes for 1,082m; a heritage survey; and soil sampling. The previous years ground magnetic survey at Red Rock Bore successfully imaged the position of the lode horizon and combined with the drilling, extending the mineralized envelope by 150m. Soil sampling showed elevated Cu up to 44ppm and grab samples returned 1140 ppm Cu, 703 ppm Zn, 2.96 precent Cu, 569 ppm Zn and 0.12 grams per tonne Au. Further ground magnetic surveys will be undertaken west of Red Rock Bore, attempting to model the magnetic high to low contact. An induced polarization survey will then help generate drill targets. |
Date Added: | 31-May-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR218_2013_GA_01.pdf | 1.6 MB | Add | |
GR218_2013_GA_02_Grab_Geochem.txt | 28.91 kB | Text | Add |
GR218_2013_GA_03_Soil_Geochem.txt | 72.1 kB | Text | Add |
GR218_2013_GA_04_DownholeGeochem.txt | 63.65 kB | Text | Add |
GR218_2013_GA_05_LithoLogs.txt | 41.09 kB | Text | Add |
GR218_2013_GA_06_DrillCollars.txt | 3.88 kB | Text | Add |
GR218_2013_GA_07_DownholeMagSusc.txt | 12.62 kB | Text | Add |
GR218_2013_GA_08_DownholeSurveys.txt | 2.33 kB | Text | Add |
GR218_2013_GA_09_LithologyCodes.txt | 17.92 kB | Text | Add |
CR2013-0921_Grab_original_lab_files.zip | 59.02 kB | ZIP | Add |
CR2013-0921_Soils_original_lab_files.zip | 83.24 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.