Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90350
Export to Endnote
Title: | EL 24196 Bowgan Project Eleventh Annual Report for the period 7 December 2014 to 6 December 2015 |
Title Holder / Company: | Marengo Mining Bowgan Minerals |
Report id: | CR2015-0776 |
Tenure: | EL24196 |
Year: | 2015 |
Author: | Price, G |
Abstract: | No field exploration was conducted on EL 24196 (Creswell Downs) during the reporting period, with office-based work being completed which included; processing of historical biogeochemical samples in preparation for analysis and interpretation of geochemical and geophysical datasets in preparation for drill hole targeting for a proposed program of first-pass exploration drilling. This work is currently on-going. |
Date Added: | 28-May-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24196_2015_A.pdf | 815.59 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.