Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90343
Export to Endnote
Title: | Combined Annual Report for the period 15 October 2013 to 14 October 2014 GR077/09 Cato Project |
Title Holder / Company: | Rio Tinto Exploration |
Report id: | CR2014-0874 |
Tenure: | EL4170; EL4171 |
Year: | 2014 |
Author: | Hartshorn, G |
Abstract: | During the reporting period exploration was conducted by GEMCO as part of the joint venture with RTX. This work included assaying of 106 RC drill chips which were drilled last period and rehabilitation of the drill sites. The assay results for the BHPB (GEMCO) drilling showed a maximum of 1 percent Mn in sandstone. RTX did not conduct any on-ground exploration during the period. |
Date Added: | 28-May-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR077_2014_GA_01.pdf | 679.53 kB | Add | |
GR077_2014_GA_02_DownholeAssays.txt | 14.26 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.