Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90282Export to Endnote
| Title: | Seventh Annual Technical Report for the period ending 7 November 2013 EL 25238 Arltunga Gold Project |
| Title Holder / Company: | Genesis Resources |
| Report id: | CR2013-0857 |
| Tenure: | EL25238 |
| Year: | 2013 |
| Author: | Karajas, J |
| Abstract: | This report details the results of a Controlled Source Audio Magneto Telluric (CSAMT) survey carried out over two separate areas within EL 25238 during late 2012. Thirteen lines were surveyed with CSAMT stations at 25m spacings for a total of 5 line kilometres. Drilling is recommended as a follow-up to the encouraging results arising from this survey. |
| NOTE: | See CR2009-0839 for Independent geological report on Australian (and former Yugoslav Republic of Macedonian) mineral assets |
| Date Added: | 20-May-2020 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL25238_2013_A.pdf | 2.76 MB | Add | |
| CR2013-0857_Geophysics.zip | 12.13 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.