Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90246
Export to Endnote
Title: Interpretation Report Palm Valley field incorporating 2002 seismic reprocessing
Title Holder / Company: Magellan Petroleum
Report id: PR2003-0002
Tenure: OL3
Year: 2002
Corporate Author: Biggan Design
Abstract: Biggan Design Pty Ltd was contracted by Magellan Petroleum Ltd in 2002 to interpret the seismic grid over the Palm Valley field incorporating the 2002 reprocessed lines. The main purpose of the interpretation of the reprocessed lines was to further understand the Palm Valley Structure and its future potential, and to locate the future possible location of the well Palm Valley-11.
The Reprocessing of previous seismic lines was conducted by Kenmore Geophysical.
Document Type: Seismic Interpretation
Seismic Processing
Date Added: 17-May-2020
Appears in Collections:Petroleum Geophysical Surveys (PEX Geophysics)

Files in this Report:
File SizeFormat Add to
Download
PR2003-0002_PR2003002_1994_Palm_Valley_2D_SS_2002_Reprocessing_Interpretation_Report.pdf903.22 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader