Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90223
Export to Endnote
Title: Combined Annual Report for the period 15 October 2012 to 14 October 2013, EL 4170 Cato Plateau and EL 4171 Cato River, Cato Project
Title Holder / Company: Rio Tinto Exploration
BHP Minerals
Report id: CR2013-0925
Tenure: EL4170;  EL4171
Year: 2013
Author: Hartshorn, G
Abstract: During the reporting period exploration was conducted by GEMCO as part of the joint venture with RTX. No field work was conducted by RTX on these tenements during the reporting period. Work completed by GEMCO included; 10 km of geological traverses including the collection of three rock samples; and RC drilling of 4 holes for a total of 193 metres. The assay results for the BHPB (GEMCO) drilling is pending at time of writing the report. Visual results show minor zones of manganese within sandstones of the Cretaceous sediments.
Date Added: 11-May-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR077_2013_GA.pdf717.23 kBPDF Add
CR2013-0925_Appendix1.zip3.13 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader