Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90133
Export to Endnote
Title: Yalco Project GR342 Combined Annual Report for the period 15 August 2014 to 14 August 2015 EL 25467 and EL29021
Title Holder / Company: Brumby Resources
Teck Australia
Report id: CR2015-0544
Tenure: EL25467;  EL29021
Year: 2015
Author: Sully, D
Armstrong, M
Abstract: During the reporting period Teck completed a high resolution airborne magnetic and radiometric survey across the entire project area, and a ground gravity survey and soil sampling program within the Emu Fault corridor on the western side of the project area. Modelling of the gravity data suggests that mineralised Barney Creek Formation may be present at depth which will become the focus of subsequent field programs.
Date Added: 26-Apr-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR342_2015_GA.pdf5.33 MBPDF Add
CR2015-0544_Geochemistry.zip86.92 kBZIP Add
CR2015-0544_Geophysics.zip124.9 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader