Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90133
Export to Endnote
Title: | Yalco Project GR342 Combined Annual Report for the period 15 August 2014 to 14 August 2015 EL 25467 and EL29021 |
Title Holder / Company: | Brumby Resources Teck Australia |
Report id: | CR2015-0544 |
Tenure: | EL25467; EL29021 |
Year: | 2015 |
Author: | Sully, D Armstrong, M |
Abstract: | During the reporting period Teck completed a high resolution airborne magnetic and radiometric survey across the entire project area, and a ground gravity survey and soil sampling program within the Emu Fault corridor on the western side of the project area. Modelling of the gravity data suggests that mineralised Barney Creek Formation may be present at depth which will become the focus of subsequent field programs. |
Date Added: | 26-Apr-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR342_2015_GA.pdf | 5.33 MB | Add | |
CR2015-0544_Geochemistry.zip | 86.92 kB | ZIP | Add |
CR2015-0544_Geophysics.zip | 124.9 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.