Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90118
Export to Endnote
Title: | Group Annual Report GR179/12 EL 28006, EL 28007, EL 28951, EL 28952 and EL 25313, 1 October 2017 to 30 September 2018 Caranbirini Project |
Title Holder / Company: | Marindi Metals |
Report id: | CR2018-0489 |
Tenure: | EL25313; EL28006; EL28007; EL28951; EL28952 |
Year: | 2018 |
Author: | Moulang, G |
Abstract: | During the reporting period 34 stations of infill gravity was completed around previously defined gravity anomalies I and A. A total of 662 soil samples were taken mostly on the western side of the project on a 400x400m grid. No anomalous base metals were found. A drill program was completed for 2429.6m. Two diamond drill holes CPDH006 (1127.7m) and CPDH007 (1198.9) were drilled targeting SEDEX style mineralisation. Neither drill hole intersected the target HYC member of the Barney Creek Formation. Epigenetic sphalerite mineralisation was intersected in the Reward Formation in both drill holes. Best results are 0.5m at 18.6% Zn from 284.4m, and 0.6m at 7.6% Zn, 0.1% Cu from 214.82m in drill hole CPDH007. |
NOTE: | Additional data available on request |
Date Added: | 24-Apr-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR179-12_2018_GA_01_Report.pdf | 3.3 MB | Add | |
GR179-12_2018_GA_02_Appendix1CaranPreviousExploration.pdf | 82.64 kB | Add | |
CR2018-0489_Drilling_Data.zip | 560.83 kB | ZIP | Add |
CR2018-0489_Geophysics.zip | 6.84 MB | ZIP | Add |
CR2018-0489_Soil_Geochemistry.zip | 137.21 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.