Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90112
Export to Endnote
Title: | Tenth Annual Report on EL 25313, EL 28006, EL 28007, EL 28951 and EL 28952 from 1 October 2016 to 30 September 2017 Caranbirini GR179 McArthur River Project |
Title Holder / Company: | Marindi Metals |
Report id: | CR2017-0486 |
Tenure: | EL25313; EL28006; EL28007; EL28951; EL28952 |
Year: | 2017 |
Author: | Treacy, JA |
Abstract: | During the 2016 / 2017 reporting period Marindi applied for and was successful in a grant under the Innovation Connections Program (Grant number RC52367). In collaboration with the CSIRO Marindi utilised a combination of geophysical [airborne electromagnetics (VTEM), ground borne gravity, hyperspectral] and geochemical techniques. Using this approach CSIRO were able to build an interactive 3D model of the subsurface geology with additional geochemical and petrographic observations to better identify targets for potentially prospective Barney Creek Formation lithologies. Marindi then contacted the Geodiscovery Group from Brisbane to review and rate target areas for follow up drilling. Drill core from the Darwin core library was reviewed and target areas ground truthed. Marindi are reviewing options regarding further work in the 2018 field season. |
NOTE: | Additional geophysics and data are available on request |
Date Added: | 24-Apr-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR179_2017_A_01.pdf | 1.79 MB | Add | |
GR179_2017_A_02_CSIRO_Report.pdf | 12.81 MB | Add | |
GR179_2017_A_03_Marindi_Caranbirini_Project.pdf | 23.89 MB | Add | |
CR2017-0486_Full_Figures.zip | 427.32 MB | ZIP | Add |
CR2017-0486_Geochemistry.zip | 14.6 MB | ZIP | Add |
CR2017-0486_Previous_Exploration.zip | 98.1 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.