Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90033Export to Endnote
| Title: | Partial Relinquishment Report for EL 30740 report period 13 October 2017 to 12 October 2019 |
| Title Holder / Company: | Prodigy Gold Independence Group |
| Report id: | CR2019-0550 |
| Tenure: | EL30740 |
| Year: | 2019 |
| Author: | McGloin, M |
| Abstract: | This report summarises the partial relinquishment of tenement EL 30740. In the reporting period (13/10/2017 to 12/10/2019), over the relinquished ground, IGO completed an airborne electromagnetic survey. This was part of a wider exploration program across the Lake Mackay project area. The tenement was also subject to a site heritage clearance by the Central Land Council. No significant exploration targets were found in the relinquished areas. IGO have relinquished ground for three reasons. There were no anomalous geophysical results from surveys conducted. There was limited access to some areas due to exclusion zones. Some areas were also relatively unexplorable with current geophysical and geochemical methods because ground was covered in sand dunes, had significant depth of cover to targeted stratigraphy, or covered non-prospective geology. This made drilling and further exploration impractical. No further work is recommended on the relinquished ground. |
| Date Added: | 27-Mar-2020 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL30740_2019_P.pdf | 624.43 kB | Add | |
| EL30740_2019_P_Figure1.pdf | 461.1 kB | Add | |
| EL30740_2019_P_Figure2.pdf | 522.36 kB | Add | |
| EL30740_2019_P_Figure3.pdf | 54.33 kB | Add | |
| EL30740_2019_P_filelisting.txt | 493 B | Text | Add |
| CR2019-0550_Appendix_1.zip | 150.97 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.