Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89983
Export to Endnote
Title: | Partial Relinquishment Report for EL 30733 report period 13 October 2017 to 12 October 2019 |
Title Holder / Company: | Prodigy Gold Independence Group |
Report id: | CR2019-0548 |
Tenure: | EL30733 |
Year: | 2019 |
Author: | McGloin, M |
Abstract: | This report summarises the partial relinquishment of tenement EL 30733. In the reporting period (13/10/2017 to 12/10/2019), IGO completed an airborne electromagnetic survey over the relinquished ground. This was part of a wider exploration program across the Lake Mackay project area. The tenement was also subject to a site heritage clearance by the Central Land Council. No significant exploration targets were found in the relinquished areas. IGO have relinquished ground for two reasons. There were no anomalous geophysical results from surveys conducted. Some areas were also relatively unexplorable with current geophysical and geochemical methods because ground was covered in sand dunes, had significant depth of cover to targeted stratigraphy, or covered non-prospective geology. This made drilling and further exploration impractical. No further work is recommended on the relinquished ground. |
Date Added: | 18-Mar-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL30733_2019_P.pdf | 605.58 kB | Add | |
EL30733_2019_P_Figure1.pdf | 460.6 kB | Add | |
EL30733_2019_P_Figure2.pdf | 527.93 kB | Add | |
EL30733_2019_P_Figure3.pdf | 258.95 kB | Add | |
EL30733_2019_P_Filelisting.txt | 516 B | Text | Add |
CR2019-0548_Appendix_1.zip | 166.97 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.