Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89964
Export to Endnote
Title: Annual and Final Report for EL 9979 Arruwurra West for the period 31 January 2002 to 19 March 2013
Title Holder / Company: Minemakers Australia
Report id: CR2013-0285
Tenure: EL9979
Year: 2013
Author: Fulton R
Abstract: Minemakers drilled two RC holes in 2010 and another six RC holes in 2012 for a total of 473 metres of drilling. A total of 151 samples were submitted for analysis. Although the holes were fairly widely-spaced (~1500m), every hole had significant phosphate mineralisation present indicating a potentially extensive and significant mineralisation at 35-50 metres depth. Best results were WNRC1525 with 13m @ 20.93% P2O5 from 48m, WNRC1748 with 14m @ 23.30% P2O5 from 45m and WNRC1747 with 22m @ 10.43% P2O5 from 36m. The tenement was surrendered on 19 March 2013 in order to be amalgamated with other Minemakers tenements into EL 29840. Exploration will continue on the new tenement..
Date Added: 18-Mar-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL9979_2013_AS_01.pdf980.21 kBPDF Add
EL9979_2013_AS_02_DrillCollars.txt5.24 kBText Add
EL9979_2013_AS_03_DownholeGeol.txt16.72 kBText Add
EL9979_2013_AS_04_DownholeGeochem.txt18.1 kBText Add
EL9979_2013_AS_05_LithologyCodes.txt10.22 kBText Add
EL9979_2013_AS_06_MagSus.txt4.86 kBText Add
EL9979_2013_AS_07_RadEye.txt4.89 kBText Add
EL9979_2013_AS_08_Filelisting.txt1.62 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader