Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89960
Export to Endnote
Title: | Annual and Final Report for EL 26185 Gum Ridge for the period 15 January 2008 to 19 March 2013 |
Title Holder / Company: | Minemakers Australia |
Report id: | CR2013-0286 |
Tenure: | EL26185 |
Year: | 2013 |
Author: | Fulton, R |
Abstract: | Minemakers drilled two RC holes in 2010 and another six RC holes in 2012 for a total of 538 metres of drilling. A total of 151 samples were submitted for analysis. Although the holes were fairly widely-spaced (=2000m), every hole had phosphate mineralisation present indicating a potentially extensive and significant mineralisation at 40-60 metres depth. Best results were WNRC1526 with 19m @ 13.6% P2O5 from 38m, WNRC1753 with 16m @ 15.9% P2O5 from 44m and WNRC1754 with 10m @ 18.6% P2O5 from 51m. The tenement was surrendered on 19 March 2013 in order to be amalgamated with other Minemakers tenements into EL 29840. Exploration will continue on the new tenement. |
Date Added: | 17-Mar-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26185_2013_AS_01.pdf | 1.06 MB | Add | |
EL26185_2013_AS_02_DrillCollars.txt | 5.21 kB | Text | Add |
EL26185_2013_AS_03_DownholeGeol.txt | 17.47 kB | Text | Add |
EL26185_2013_AS_04_DownholeGeochem.txt | 18.29 kB | Text | Add |
EL26185_2013_AS_05_LithologyCodes.txt | 10.23 kB | Text | Add |
EL26185_2013_AS_06_MagSus.txt | 2.69 kB | Text | Add |
EL26185_2013_AS_07_RadEye.txt | 2.93 kB | Text | Add |
EL26185_2013_AS_08_Filelisting.txt | 1.28 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.