Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89860
Export to Endnote
Title: | GR244/13 Kulgera Heavy Mineral Project Group Annual Report for the period 14 January 2012 to 13 January 2013 |
Title Holder / Company: | Globe Mineral Resources |
Report id: | CR2013-0063 |
Tenure: | EL27417; EL27418; EL27419; EL29274 |
Year: | 2013 |
Author: | Lindsay-Park, K |
Abstract: | During the report year, a considerable amount of work has been completed on the Kulgera Heavy Mineral Project. The work has focused on defining the nature and distribution of the mineralisation present. The Kulgera Heavy Mineral project consists of 4 prospect areas, only one of which (Arrakis) with 622 AC drillholes and has been drill tested. The results available suggest a global resource of heavy mineral (HM) sands between 7.5 and 10 billion tonnes is achievable. Head assaying of the drill hole composite samples has shown an iron-ore quality material containing about 30% TiO2 can be made just using gravity separation methods. A drilling program and budget has been prepared for 2013 which has been designed to elevate the Inferred resource to an Indicated category and to complete the mineralogical and metallurgical studies. |
Date Added: | 13-Feb-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR244_2013_GA_01.pdf | 1.63 MB | Add | |
GR244_2013_GA_02_SurfaceGeochem.txt | 4.16 kB | Text | Add |
GR244_2013_GA_03_SurfaceGeochem.txt | 119.27 kB | Text | Add |
GR244_2013_GA_04_SurfaceGeochem.xlsx | 133.03 kB | Microsoft Excel XML | Add |
GR244_2013_GA_05_COLL2013A.txt | 56.7 kB | Text | Add |
GR244_2013_GA_06_ASS2013A.txt | 1.04 MB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.