Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89842
Export to Endnote
Title: | Annual Report ML 23812 Spring Hill for the period 16 January 2012 to 15 January 2013 |
Title Holder / Company: | WDR Gold TM Gold Thor Mining |
Report id: | CR2013-0107 |
Tenure: | ML23812 |
Year: | 2013 |
Author: | Bradey, R |
Abstract: | Drilling resumed at Spring Hill in July 2012 continuing through to early September 2012. The program comprised 570 metres of RC pre-collar and 1612 metres of diamond tail. Objectives of this program were to finalise the program commenced in 2011 to test down dip extensions to the Hong Kong lode below 150 metres and to test for separate deeper mineralisation within the Koolpin Formation. |
Date Added: | 10-Feb-2020 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
ML23812_2013_A.pdf | 2.19 MB | Add | |
SH_Library_Lithology.txt | 7.17 kB | Text | Add |
SH_Library_Minerals.txt | 25.67 kB | Text | Add |
SH_NTDG4_ASS2013A.txt | 105.88 kB | Text | Add |
SH_NTDL4_GEO2013A.txt | 25.17 kB | Text | Add |
SH_NTDS4_SURV2013A.txt | 7.27 kB | Text | Add |
SH_NTSL4_COLL2013A.txt | 2.1 kB | Text | Add |
SH_Verification_List_2013.txt | 1.23 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.