Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89752
Export to Endnote
Title: Annual Technical Report Nobles Nob Project period 1 January 2012 to 31 December 2012
Title Holder / Company: Tennant Gold
Excalibur Mining
Report id: CR2012-1223
Tenure: MLC512;  MLC513;  MLC514;  MLC515;  MLC516;  MLC517;  MLC521;  MLC525;  MLC526;  MLC531;  MLC532;  MLC533;  MLC534;  MLC537;  MLC538;  MLC539;  MLC540;  MLC541;  MLC542;  MLC543;  MLC544;  MLC545;  MLC548;  MLC549;  MLC550;  MLC556;  MLC589;  MLC590;  MLC688;  MLC689;  MLC690;  MLC691
Year: 2012
Author: Hanson, J
Abstract: In July of 2012 all Nobles Nob rehabilitation was completed, this includes all prospects from Nobles Nob West to Rising Sun this work included reshaping land surfaces, capping drill holes in accordance with departmental regulations and the removal of all sample bags. Any future mapping in the rehabilitated areas is now not possible except where large outcrops occur. Between July and August 2012 five diamond drill holes were completed to the east of Nobles Nob Pit with a total of 1455.9m. The drill hole localities were recommended by SRK Consulting and were based on geophysical anomalies. Drill core was assayed for gold only and there were no significant results.
Date Added: 6-Jan-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR018_2012_GA_01.pdf1.28 MBPDF Add
GR018_2012_GA_02_DHCollars.txt3.2 kBText Add
GR018_2012_GA_03_DownholeGeochem.txt57 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader