Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89514
Export to Endnote
Title: | Mount Shoobridge Project EL 23105 Final Report incorporation the Year 10 Annual Report for the period 26 September 2002 to 7 August 2012 |
Title Holder / Company: | Altura Exploration |
Report id: | CR2012-0652 |
Tenure: | EL23105 |
Year: | 2012 |
Author: | Bourke, BG |
Abstract: | Exploration studies during Year 10 included desktop studies, the integration of geophysical and geological data, field reconnaissance and rock chip sampling. Field data collected were rock chips from the #A3 zinc anomaly to the north of the Fenton base camp. |
NOTE: | See previous Annual Reports for digital data |
Date Added: | 19-Nov-2019 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR2012-0652_EL_23105_2012_AS_01.pdf | 1.63 MB | Add | |
CR2012-0652_EL_23105_2012_AS_02_SurfaceGeochem.txt | 3.24 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.