Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89469
Export to Endnote
Title: Annual Report for the period 25 September 2014 to 24 September 2015 EL 23971 Arrla Bay 4
Title Holder / Company: Rio Tinto Exploration
Report id: CR2015-0587
Tenure: EL23971
Year: 2015
Author: Black, A
Abstract: No ground work was completed on the tenement during the period of this report. Planning work for a ground based geophysical survey took place and a meeting with the Northern Land Council (NLC) was held on 16 September 2015 granting permission to conduct the survey in October 2015.
Date Added: 4-Nov-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL23971_2015_A.pdf364.93 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader