Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89460
Export to Endnote
Title: EL 29599 Annual Technical Report, Bonya Copper Project Reporting period 10 May 2017 to 9 May 2018
Title Holder / Company: Rox Resources
Report id: CR2018-0230
Tenure: EL29599
Year: 2018
Author: Belbin, W
Abstract: The Bonya Project in the Northern Territory is located 400 km east of Alice Springs (Figure 1). The area is highly prospective for base metals, with known occurrences of copper, gold and tungsten. Rox Resources Limited was granted EL 29599 in 10th May 2013 and is currently also earning into the adjacent EL 29701 with Arafura Resources Limited. This report covers work done on EL 29599 from 10th May 2017 to 9th May 2018. Previous exploration by Rox has included soil sampling, field mapping, airborne and ground geophysical surveys, and RC drilling. Several significant copper occurrences have been identified on the project, including the historical Bonya copper mine on the adjacent EL 29701. Work carried out during the reporting period including prospecting, ground gravity surveying and target generation.
NOTESee CR2017-0505 for Gravity Survey Data
Date Added: 4-Nov-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL29599_2018_A.pdf2.61 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader