Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89382
Export to Endnote
Title: Annual Report EL 26978, 23 July 2011 to 22 July 2012 Winnecke Project
Title Holder / Company: Fertoz
Report id: CR2012-0617
Tenure: EL26978
Year: 2012
Author: Szonyi, L
Abstract: Work conducted in the third year consisted of desktop studies and the submission of a Mine Management Plan for the Winnecke Project. The exploration work done to date has not successfully explored EL 26978 for the presence of phosphate mineralisation. What limited work that has been done has proved that the transported soils effectively are geochemically blanketing the underlying rocks. The only effective way to examine the underlying strata is by drilling, firstly using either Aircore (recommended) or Reverse Circulation methods. Fertoz plans to carry out drilling in the next twelve months. It will target the eastern side of EL 26978.
Date Added: 26-Sep-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL26978_2012_A.pdf3.75 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader